Following the third quarterly review of applications for 2025, the Minister for Sport and Sports Infrastructure, Jacqueline Galant, has given her approval in principle for 6 projects at the preliminary design stage, representing a total of €10,214,830. In addition, 17 applications received a firm commitment for subsidies totalling €18,476,770. The results of a final review for 2025 could be announced before the end of the year. “Following responsible and ambitious budget negotiations, we prove it once again: no cuts to sport, nor to relevant construction or renovation of sports infrastructure. Contrary to the accusations levelled by some in recent days, these very concrete subsidies once again demonstrate our Government's support for municipalities and local authorities,” said Jacqueline Galant, Minister for Sport and Sports Infrastructure.
As a reminder, these subsidies, generally awarded quarterly, help develop and maintain sports infrastructure in line with criteria such as an ethics charter, accessibility for people with reduced mobility, energy-efficient construction and the use of sustainable materials…
An approval in principle for 6 applications
The Minister for Sport and Sports Infrastructure has given approval in principle for 6 applications at the preliminary design stage. To limit expenditure before a subsidy is obtained, applications requiring the involvement of a project designer receive an approval in principle. On this basis, project promoters can proceed with their application with the guarantee of obtaining a firm commitment for subsidy once their technical file has been validated and budget availability confirmed.
| Municipality | Project promoter | Subject | Subsidy |
| AYWAILLE
LIÈGE | RCA Aywaille | Renovation of the swimming pool and hall at the Aywaille sports complex | 4.200.000 € |
| LIÈGE
LIÈGE | AC Liège | Demolition and reconstruction of a new refreshment/changing rooms building at FC Jupille | 1.427.880 € |
| OREYE
LIÈGE | AC Oreye | Renovation of the lighting of pitches A and B at Royal Oreye Union | 77.690 € |
| THEUX
LIÈGE | RCA Theux | Construction of an outdoor pool and extension of the covered tennis hall at TC Theutois | 1.868.930 € |
| BIÈVRE
NAMUR | ASBL Tennis Club de Bièvre | Construction of two padel courts + energy and electrical renovation of the clubhouse | 417.890 € |
| QUAREGNON
HAINAUT | AC Quaregnon | Renovation of the Wasmuël sports hall | 2.222.440 € |
A firm commitment for 17 applications
17 applications also received a firm commitment during this second quarterly review of the year.
| COURT-SAINT-ETIENNE
WB | RCA de Court-Saint-Etienne | 1st sports and maintenance equipment | 186.100 € |
| ATH
HAINAUT | RCA d'Ath | Replacement of the sports flooring at Marcel Denis Hall | 87.510 € |
| BINCHE
HAINAUT | AC Binche | Design and construction of a skate park at the Cité Jardin | 238.870 € |
| BRAINE-LE-COMTE
HAINAUT | RCA Braine Ô Sports | Redevelopment of the Higuet stadium in Ronquières | 1.327.150 € |
| ÉCAUSSINNES
HAINAUT | ASBL Les Archers du Pilori | Renovation of the pole archery range in Marche-Lez-Ecaussines | 11.270 € |
| HAM-SUR-HEURE-NALINNES
HAINAUT | ACBL Football Club Nalinnois | Construction of a synthetic pitch and replacement of the lighting with LED on both pitches | 799.740 € |
| SIVRY-RANCE
HAINAUT | AC Sivry-Rance | Renovation of the Rance multi-sports hall | 1.000.500 € |
| DONCEEL
LIÈGE | ASBL Union Sportive Donceel | Construction of new facilities for Union Sportive Donceel | 1.581.880 € |
| FLÉRON
LIÈGE | RCA Fléron | Renovation of the swimming pool | 4.200.000 € |
| BERTRIX
LUXEMBOURG | RCA Bertrix | Construction of a multidisciplinary centre | 2.047.500 € |
| AUBANGE
LUXEMBOURG | ASBL Tennis Club Halanzy | Construction of two padel courts, installation of LED lighting and thermal optimisation of buildings and premises | 320.970 € |
| LA ROCHE-EN-ARDENNE
LUXEMBOURG | RCA La Roche-en-Ardenne | Purchase of the first equipment for the sports complex | 24.960 € |
| MARTELANGE
LUXEMBOURG | RCA de Martelange | Renovation of the Im Wohr hall and tennis courts, creation of padel courts and purchase of sports equipment | 1.311.800 € |
| SAINT-HUBERT
LUXEMBOURG | AC Saint-Hubert | Construction of a dojo | 718.090 € |
| VAUX-SUR-SÛRE
LUXEMBOURG | RCA Vaux-sur-Sûre | Fitness and cross-training area | 122.010 € |
| ASSESSE
NAMUR | RCA des Sports d'Assesse | Construction of a synthetic pitch + various annex rooms | 2.263.580 € |
| OHEY
NAMUR | AC Ohey | Extension and renovation of the sports centre | 2.234.840 € |