Skip to Content

Press ENTER to search or ESC to close

€11.6 million for Walloon sports infrastructure in the second quarter of 2025

26/06/2025
In brief

Following the second quarterly analysis of the 2025 files, the Minister for Sport and Sports Infrastructure, Jacqueline Galant, gave her agreement in principle for 7 projects at the preliminary design stage, representing a total of €4,519,270.

In addition, 10 projects received a firm grant commitment totalling €7,061,940. The conclusions of the next quarterly analysis are expected to be announced in the autumn. “Once again, Wallonia stands alongside local authorities to support sport where it is lived: on the pitch, in our towns, in our villages, in our neighbourhoods,” says Jacqueline Galant, Minister for Sport and Sports Infrastructure.

As a reminder, these grants, awarded every quarter, enable the development and maintenance of sports infrastructure in line with criteria such as an ethical charter, accessibility for people with reduced mobility, energy-efficient construction and the use of sustainable materials…

An agreement in principle for 7 files

The Minister for Sport and Sports Infrastructure has given an agreement in principle for 7 files at the preliminary design stage. To limit spending before a grant is obtained, files requiring the involvement of a project designer are subject to an agreement in principle. On this basis, project promoters can continue their file with the guarantee of receiving a firm grant commitment once their technical file is validated and budget availability is checked.




















































MunicipalityProject promoterSubjectGrant
FAIMES

LIÈGE

AC FaimesInstallation of a well and renovation of the lighting of the football pitches at CS Cortil Jonet275 250,00 €
LIÈGE

LIÈGE

ASBL Old ClubRenovation of hockey pitch no. 2 and construction of a clubhouse1 596 710,00 €
MALMEDY

LIÈGE

ASBL Malmedy-Trial BikeCreation of an infrastructure dedicated to MTB trial247 770,00 €
BASTOGNE

LUXEMBOURG

IDELUXRenovation of the Porte de Trèves sports centre1 890 000,00 €
METTET

NAMUR

ASBL Tennis Indoor MettetCovering of two padel courts121 450,00 €
NAMUR

NAMUR

AC NamurJambes sports hall: Replacement of the vault roofing56 080,00 €
HAM-SUR-HEURE-NALINNES

HAINAUT

ASBL Rugby Sur HeureExtension of the building to fit out changing rooms332 010,00 €

 

A firm commitment for 10 files

10 files also received a firm commitment during this second quarterly analysis of the year.
































































WALHAIN

WB

AC WalhainWalhain sports centre2 286 900,00 €
CHARLEROI

HAINAUT

AC CharleroiConstruction of a synthetic football pitch919 460,00 €
CHAPELLE-LEZ-HERLAIMONT

HAINAUT

AC Chapelle-lez-HerlaimontPhase 2 of the Claire-Fontaine football complex992 080,00 €
SPA

LIÈGE

AC SPAImprovement of the acoustics and renovation of the sports floor covering at the Warfaaz sports centre96 790,00 €
VERVIERS

LIÈGE

RCA SynergisRenewal of the sports floor covering at the Gérarchamps sports hall46 500,00 €
ARLON

LUXEMBOURG

City of ArlonInstallation of lighting and equipment for the Toernich football pitch142 420,00 €
LIBRAMONT-CHEVIGNY

LUXEMBOURG

AC of Libramont-ChevignyExtension of the tennis club1 509 050,00 €
NAMUR

NAMUR

ASBL Royal Tennis Club Amée-JambesExtension of the tennis club46.770 €
PHILIPPEVILLE

NAMUR

AC PhilippevilleCreation of a multi-sports area in Villers-le-Gambon144 390,00 €
PROFONDEVILLE

NAMUR

AC ProfondevilleRenovation and extension of the sports hall877 580,00 €

 

Automatically translated from French. Read the original